  • 橋梁護欄的安裝步驟
  • 本站編輯:杭州楷高實業有限公司發布日期:2019-05-09 16:33 瀏覽次數:

(1)橋梁護欄預制場地應平整、堅實、干凈,應采取排水措施,防止現場沉降。每個預制件應一次完成而不中斷。當澆注預制件時,應使用剛性護欄。

(2)橋梁護欄當混凝土采用水平重疊法澆筑時,應在下部構件頂部設置臨時隔離層,僅在下層混凝土強度達到5 MPa后才能澆注上部構件。

(3)在空心板管形式周圍澆筑混凝土時,應采取措施防止管材移位,應特別注意防止管體浮起。橋梁護欄混凝土應澆筑兩層。底部應澆注到管模具的中心,并振動沉積。然后,在下層混凝土足夠塑性的情況下,應盡快澆筑上層。上層混凝土應采用振動器與下層混凝土相結合。

(4)在腹板底部擴大截面的T形和I形梁應加寬,然后倒腹板和凸緣板。

(5)預制件底部護欄應按圖紙要求安裝。預應力混凝土梁板應根據圖紙提供的理論拱度值和實際施工情況,正確預測梁拱的變化,并采取相應的措施。如果預應力后張法預應力混凝土的拱度大,則應考慮在預制橋臺上安裝反拱。當梁的實際彎度較大時,會影響混凝土橋面的施工,應向監理工程師書面報告,會同設計單位協商解決。

(6)U梁或拱肋可一次或兩次澆注。在一次澆筑中,首先澆筑底部支承的底部和頂部,然后在上述混凝土固結后澆注腹板。澆筑兩次時,先將底板澆注到支承板頂部,然后根據施工縫澆注腹板混凝土。

(7)箱梁橋梁護欄的澆筑應先倒在地板上,振動壓實,然后倒在腹板上。腹板的澆注可以分段進行,也可以從一端到另一端進行,夯實。箱梁澆筑應采取必要措施拆除箱梁護欄。

(8)所有預制件均應按照圖紙準確嵌入,不得遺漏。

橋梁護欄就選杭州楷高實業有限公司。批發的價格,讓您省錢;品牌的質量,讓您省心。

l2-1G221155Q4-50_350_240[1].jpg

(1) Bridge guardrail prefabrication site shall be level, solid and clean, and drainage measures shall be taken to prevent settlement on site. Each preform shall be completed at one time without interruption. Rigid guardrails shall be used when casting prefabricated parts.
(2) When the concrete of bridge guardrail is poured by horizontal overlapping method, a temporary isolation layer shall be set on the top of the lower member, and the upper member can only be poured after the strength of the lower concrete reaches 5 MPa.
(3) When pouring concrete around the hollow slab pipe form, measures should be taken to prevent the pipe from shifting, and special attention should be paid to prevent the pipe from floating up. Two layers of bridge guardrail concrete shall be poured. The bottom shall be poured into the center of the pipe mold and vibrated for deposition. Then, if the concrete in the lower layer is plastic enough, the upper layer should be poured as soon as possible. The upper concrete shall be combined with the lower concrete by vibrators.
(4) T-shaped and I-shaped beams with enlarged section at the bottom of the web plate shall be widened, and then the web plate and flange plate shall be inverted.
(5) The guardrail at the bottom of prefabricated parts shall be installed according to the drawing requirements. Prestressed concrete beams and slabs shall correctly predict the changes of beam arches and take corresponding measures according to the theoretical camber values provided in the drawings and the actual construction conditions. If the camber of pre-stressed post-tensioned pre-stressed concrete is large, the installation of reverse arch on the precast bridge deck should be considered. When the actual bending degree of the beam is large, it will affect the construction of the concrete bridge deck, and a written report shall be submitted to the supervision engineer, which shall be settled through consultation with the design unit.
(6)U beam or arch rib can be poured once or twice. In one casting, the bottom and top of the bottom support are first cast, and then the web is cast after the above concrete is consolidated. When pouring twice, the bottom plate shall be poured to the top of the support plate first, and then the web plate concrete shall be poured according to the construction joints.
(7) The pouring of box girder bridge guardrail shall be first poured on the floor, vibrated and compacted, and then poured on the web plate. The casting of the web plate can be carried out in sections or from one end to the other end for compaction. Necessary measures shall be taken to dismantle box girder guardrail during box girder casting.
(8) All prefabricated parts shall be accurately embedded according to the drawings and shall not be omitted.